Vhelbherg Gbetiokun Project

Gbetiokun EPF is a 22,000 Capacity facility Built and operated by Vhelbherg international limted on behalf of NPDC and her Joint venture PartnersĀ  Elcrest Exploration and Production. The facility is located in OML 40, 25 Minutes boat ride off Koko town in Delta state Nigeria.

It is a 2-stage ,3 phase separation facility designed to provide a 0.5% BS&W crude separation specification.

The EPF is Equipped with Testing facilities suitable for multi-rate well testing to enable all well-testing activities. The state of the art facility also has Metering facilities andĀ  associated utilities comprisingĀ  compressors, two 500KVA Diesel driven generators, state of the art Fire fighting capabilities and a 5000BPD Produced water treatment Unit capable of treating produced water to below 10PPM.